Performing A Test
Watch the NC-stat DPNCheck Instructional Video

Performing a test with the DPNCheck is straightforward and takes only about a minute. The testing process is easy to learn and it is typically performed by staff.

Testing Process – Results in Four Easy Steps:

  • Position patient, prepare testing area

    Position patient, prepare testing area

  • Place biosensor, apply gel

    Place biosensor, apply gel

  • Position device, start test

    Position device, start test

  • 10-15 seconds later read results

    10-15 seconds later read results